Shopno Grand City
← Back to ProjectsFlagship Development

Shopno Grand City

A modern mixed-use destination connecting residential living, retail and community amenities.

Location

Dhaka Metro Corridor

Project Type

Mixed-Use Flagship

Total Area

12.5 Acres

Building Size

850,000 sqft

Units

420 Residences + Retail

Expected Completion

Q4 2027

Development Status

Planning & Pre-Development

Reporting

Investor Portal

Project Overview

The vision behind the place.

Shopno Grand City is envisioned as a flagship mixed-use development where architecture, open space and digital project visibility work together.

Location

Context that shapes value.

Positioned along a growing metropolitan corridor with access to major roads, civic services and future transit connections.

Master Plan

A clear development framework.

The master plan organizes residential blocks, retail edges, green courtyards and pedestrian paths into a clear circulation framework.

Architecture

Form, light and livability.

Contemporary massing with layered terraces, generous glazing and warm material accents.

Structural Design

Engineering with professional care.

Structural concepts emphasize code-aligned engineering and foundation strategies informed by site assessment.

Construction Progress

Visibility as the project advances.

Currently in planning and pre-development. Progress reporting appears in the investor portal as the project advances.

Safety Features

Designed with responsibility.

  • Engineering-led structural design approach
  • Geotechnical assessment prior to foundation works
  • Quality-controlled materials and stage inspections
  • Fire and life-safety planning coordination
  • Building-code compliance checkpoints
Investment Opportunity

Transparent participation.

Investors can follow approved project information, staged participation terms and progress updates through a secure digital account.

Financial Overview

Illustrative snapshot.

Illustrative Development Cost৳ 48.00 Cr
Land & Enabling Works৳ 12.50 Cr
Construction Envelope৳ 28.00 Cr
Reporting CycleMonthly / Quarterly

Illustrative figures for interface demonstration only. Replace with audited/approved project data before publication.

Investor Benefits

What participation unlocks.

01

Structured project visibility

02

Document access for approved files

03

Progress timeline tracking

04

Dedicated investor communication channel

05

Community-focused long-term value thesis

Documents

Approved files & records.

Project Concept Brief

PDF · Coming soon

Portal Access

Master Plan Summary

PDF · Coming soon

Portal Access

Investment Overview (Illustrative)

PDF · Coming soon

Portal Access

Progress Report Template

PDF · Coming soon

Portal Access
Videos

Stories from the project.

Video

Concept Walkthrough

Video embed placeholder — add approved media later.

Video

Site Context Film

Video embed placeholder — add approved media later.

Progress Timeline

From concept to community.

  1. Completed

    Land & Feasibility

    Site assessment and opportunity framing

  2. In Progress

    Master Planning

    Layout, massing and amenity structure

  3. Upcoming

    Engineering

    Structural and geotechnical development

  4. Upcoming

    Investor Participation

    Portal onboarding and reporting setup

  5. Upcoming

    Construction

    Phased build and quality controls

  6. Upcoming

    Handover & Community

    Delivery and asset management